Major Renovations Begin at Coastal for Phase One!Phase One of renovations at Coastal began December 14th! The construction crew arrived and promptly began removing old water rotted ceiling tiles that were damaged by water leaking through the roof. Inside the center, all the flooring in the gathering areas will be replaced, the kitchen will be upgraded, and the dining hall expanded. But the best improvement to come is the new roof that will stop our leaking problems! |
||||||||||||||||||||||||||||||||
COASTAL RETREAT - DAY ONE
Phase One concentrates on the exterior and gathering areas of the center. The guest room wing will be addressed in later stages. You can join in the effort to move into the next Phase! Become a "Phase One Building Block"- Click here for a Pledge Form or DONATE NOW |
||||||||||||||||||||||||||||||||
COASTAL RETREAT - DAY TWO
Steel supports are begin installed for the new roof over the dining hall & gathering area of the center.
On the left, the kitchen is being prepared for remodeling. The serving line buffet has been removed. On the right, the Welcome Lounge next to the dining room has been striped of carpet and is ready to see some new flooring!
COASTAL RETREAT - THE WEEK OF CHRISTMAS
What a better Christmas gift than a new roof? Support beam trusses are installed on the roof of Coastal's Dining Hall. The new roof will have a functional and asthetically pleasing pitched roof. The new year will brings a fresh new look to your Coastal Retreat Center! Celebrate our new 2010 beginnings with a pledge as low as $125 a year!
COASTAL RETREAT - THE BEGINNING OF A NEW YEAR
The New Year is swiftly bringing a new roof to the lower section of the Coastal Retreat Center. In the photos above you can see the work in assembling the roof and the preparation of the exterior stucco coating. Also demolition of the interior walls that separated the dining room and meeting rooms is pictured. Below you can see the completed base later of roof and the start of the stucco exterior covering. To the right, the skeleton of the remaining walls inside the dining room.
COASTAL RETREAT - JANUARY 7TH While the majority of renovations to Coastal during Phase One is taking place in the common gathering areas of the center, an exciting addition is being made in the bedroom wing! Selected bedrooms are receiving adjoining doors that will allow private access between the two rooms. Retreatants will have the option of privacy with a locked door or the welcoming invite of and open door. This improvement will be particularly helpful to family congregational groups with children on retreat.
COASTAL RETREAT - JANUARY 12
Exciting developments are happening to the interior of the Coastal Retreat Center. All new carpet is beginning installed in the guest rooms and hallway (top left). Top right you see paint and supplies used to paint the ceilings upstairs and the rear stairwell. Below there is a shipment of sheetrock that was just delivered to a now barren welcome lobby, and is being used in the picture to the right to put up new walls in the kitchen! Everything is getting refreshed!
COASTAL RETREAT - JANUARY 27
Things are coming together nicely at Coastal as the new layout of counter space and new appliances are being installed in the kitchen! Also, at the top right you can see the new serving line is situated in an opening in the wall that allows the kitchen to overlook the dining room! Below and to the left you can see the dining room as it has been expanded into the areas that used to be small storage/lounge rooms. This will allow for bigger groups and better seating arrangements. Below and to the right you see the brand new coffee bar station that was installed upstairs right where the stairway lets out on the second floor. This coffee bar will serve as a functional separation between the stairway entrance and the upstairs meeting room. The 2 photos at the very bottom showcase our new Lutheran Red Roof that will not only keep out the leaks but give our building that lowcountry island feel - truly making this Your Lutheran Beach Retreat!
COASTAL RETREAT - FEBRUARY 2010 - PHASE ONE COMPLETE!
Herbert Loadholt, Resident Director of Coastal, invites you to drop by the retreat center and see the completed renovations! We pray these renovations will make your time at the Coastal Retreat Center a more comfortable and meaningful experience.
|
Help Us Complete Phase One Renovations and move forward with Phase Two!
All donations are Tax-deductible
RECEIVE EMAIL UPDATES ABOUT THE RENOVATIONS FROM SCLRC! |